ICEBREAKER CLEARS WAY FOR SHIPPING ON
FRIDAY, FEBRUARY 22, 2008
![]() |
![]() |
![]() |
![]() |
The Algosteel, the Canadian freighter
pictured below, is about to leave the
Toledo Shipyard's dry docks after
spending over a month on repairs.
Heavy ice on the Maumee River
made passage impossible without
the aid of the USCG
Cutter Neah

Bay, shown left clearing a way to
the Lake. Icebreaker operations,
such as performed by the George
Gradel tug, below, also play an
important role in vessel traffic.
In this case, the
tug is clearing
the entryway of the Toledo
Shipyard's dry dock doors,
allowing them to open into the
channel.