R 032111Z FEB 12 ALCOAST 050/12 COMDTNOTE 4550 SUBJ: MARCH 2012 CG-WIDE PHYSICAL INVENTORY OF CG ASSETS - WARNING ORDER A. FINANCIAL RESOURCE MANAGEMENT MANUAL-PROCEDURES (FRMM-P), COMDTINST M7100.4(SERIES) B. U.S. COAST GUARD PERSONAL PROPERTY MANAGEMENT MANUAL, COMDTINST M4500.5(SERIES) C. FINANCIAL RESOURCE MANAGEMENT MANUAL (FRMM), COMDTINST M7100.3(SERIES) 1. IAW REF A, A CG-WIDE PHYSICAL INVENTORY OF CG ASSETS WILL BE HELD 01 MAR - 09 MAR 2012. THIS PHYSICAL INVENTORY WILL INCLUDE ALL CG VESSELS, CG AIRCRAFT, CG BOATS, ALL MOTOR VEHICLES (CG-OWNED AND LEASED) AND TRAILERS, CAPITALIZED GENERAL PURPOSE PROPERTY, CAPITALIZED ELECTRONICS, AND SOFTWARE WITH AN ACQUISITION COST GREATER THAN 2500 DOLLARS. TWO NOTABLE CHANGES BEING IMPLEMENTED THIS INVENTORY WHICH WILL BE OFFICIALLY PROMULGATED WITH THE RELEASE OF THE ACTION ORDER ARE: THE INCLUSION OF SOFTWARE GREATER THAN 2500 DOLLARS, PARA 7, AND AN ENVIRONMENTAL LIABILITY SITE ASSESSMENT FOR SPECIFICALLY IDENTIFIED UNITS WITH REAL PROPERTY, PARA 8. 2. OUR LONG-TERM GOAL IS TO ENSURE THAT ALL PROPERTY, REAL AND PERSONAL, IS ACCOUNTED FOR IN ACCORDANCE WITH FEDERAL REQUIREMENTS AND STANDARDS. 3. RESPONSIBILITIES: A. COMMANDING OFFICERS, OFFICERS-IN-CHARGE AND UNIT-LEVEL SUPERVISORS ARE RESPONSIBLE FOR ENSURING THEIR UNIT COMPLETES THE INVENTORY REPORT DURING THE SPECIFIED PERIOD AND FOR CERTIFYING THE EXISTENCE AND COMPLETENESS OF PROPERTY ASSETS FOR THEIR UNIT. B. ACCOUNTABLE PROPERTY OFFICERS (APOS) ARE RESPONSIBLE FOR THE OVERALL EXECUTION AND MANAGEMENT OF THE PHYSICAL INVENTORY AT THEIR UNIT AND SUBMISSION OF THE INVENTORY REPORT TO COMDT (CG-844). C. CHAINS OF COMMAND ARE RESPONSIBLE FOR ENSURING THAT ALL SUBORDINATE UNITS HAVE AN OPFAC IN ORACLE FIXED ASSET MODULE (FAM) ASSIGNED BY THE OFCO PROCESS AND THAT ALL SUBORDINATE UNITS SUBMIT THEIR INVENTORY PACKAGES BY THE DEADLINE. D. COMDTS (CG-43, CG-643, CG-711, CG-731, AND CG-751): ARE RESPONSIBLE FOR ENSURING ALL PROGRAM MANAGED ASSETS ARE REVIEWED PERIODICALLY AND LISTED PROPERLY WITHIN ALMIS, AOPS, FMVRS, AND ORACLE. 4. TIMELINE FOR CG-WIDE PHYSICAL INVENTORY OF CG ASSETS. A. 9 FEB 2012: CG-WIDE LIVE WEBCAST TRAINING FOR APOS AND COUNT TEAMS B. 10 FEB 2012: PROPERTY PHYSICAL INVENTORY PORTAL SITE POPULATED WITH UPDATED PROCEDURES FOR THE MARCH INVENTORY (PARA 5). C. 10 FEB - 27 FEB 2012: COMMANDING OFFICERS, OFFICERS-IN-CHARGE, UNIT-LEVEL SUPERVISORS, AND APOS ARE DIRECTED TO REVIEW THE PHYSICAL INVENTORY PORTAL SITE. D. 01 MAR - 09 MAR 2012: COUNT PHASE. ALL CG UNITS CONDUCT CG-WIDE PHYSICAL INVENTORY AS PER (PARA 1). ALL UNITS MUST SUBMIT THE FINAL PHYSICAL INVENTORY CERTIFICATION PACKAGE NLT COB 9 MAR 2012. E. 01 MAR - 20 MAR 2012: COMDT (CG-844) REVIEWS PHYSICAL INVENTORY PACKAGE SUBMISSIONS. F. 12 MAR - 30 MAR 2012: FINCEN (FR) UPDATES ORACLE FAM WITH ALL ADDITIONS, DELETIONS, AND EDITS IDENTIFIED DURING THE MARCH 2012 INVENTORY. 5. THE CG PORTAL WILL REMAIN THE ONE-STOP SHOP FOR ALL PHYSICAL INVENTORY NEEDS. THE PORTAL SITE INCLUDES ALL DOCUMENTS NECESSARY TO FACILITATE AN INVENTORY AND CAN BE ACCESSED FROM THE FOLLOWING LINK: HTTPS://CGPORTAL.USCG.MIL/CTL/BST3RF. AN OUTLOOK E-MAIL INBOX HAS BEEN CREATED FOR THE SUBMISSION OF INVENTORY PACKAGES, QUESTIONS, AND THE REPORTING OF ISSUES. THE E-MAIL ADDRESS IS CAP-PHY-INV (AT) USCG.MIL. THIS INBOX WILL BE MANNED THROUGHOUT THE INVENTORY. UNDERWAY UNITS THAT HAVE NO CONNECTIVETY ARE REMINDED TO UTILIZE THE INVENTORY SUBMISSION MESSAGE. AN EXAMPLE IS POSTED ON THE PHYSICAL INVENTORY PORTAL. 6. IN PREPARATION FOR THE MARCH 2012 PHYSICAL INVENTORY UNITS MUST BE PROACTIVE AND ENSURE THEIR ORACLE FAM RECORDS ARE ACCURATE PRIOR TO THE PHYSICAL INVENTORY. IN ADDITION, UNITS SHOULD: A. RECONCILE OPERATIONAL, LOGISTICS, MAINTENANCE, AND FINANCIAL SYSTEMS (E.G. ALMIS, AOPS, FMVRS, ETC.) TO ORACLE FAM ENSURING ASSET LOCATIONS AND CONDITIONS ARE ALIGNED. IF DISCREPANCIES EXIST, CONTACT THE APPROPRIATE PERSONNEL (E.G. REGIONAL BOAT MANAGERS, MOTOR FLEET MANAGERS) TO CORRECT THE DISCREPANCIES PRIOR TO THE 2012 MARCH INVENTORY. B. ENSURE ALL PERSONAL PROPERTY ASSETS ON SITE ARE ENTERED INTO ORACLE FAM. IF CAPITALIZED PROPERTY WAS PURCHASED AND NOT RECORDED DURING THE FY, SEND INVOICES, RECEIVING REPORTS AND OTHER SUPPORTING DOCUMENTATION AS REQUIRED BY REF B TO FINCEN (FR) FOR RECORD UPDATES. C. ALL MODERNIZED UNITS MUST TRANSFER ALL PROPERTY FROM LEGACY OPFACS TO THE CURRENT ACCOUNTABLE OPFAC. INVENTORY REPORTS UNDER LEGACY OPFACS WILL NOT BE ACCEPTED. IT IS THE RESPONSIBILITY OF THE LEGACY UNITS PARENT COMMAND TO ENSURE LEGACY OPFACS HAVE NO PROPERTY REMAINING IN ORACLE FAM. 7. THE MARCH 2012 PHYSICAL INVENTORY WILL INCLUDE SOFTWARE WITH AN ACQUISITION COST GREATER THAN 2500 DOLLARS. THE DEFINITION OF SOFTWARE CAN BE FOUND IN REF C, PARA. 7.F.1. SOFTWARE INCLUDES OPERATIONAL, ADMINISTRATIVE, DECISION SUPPORT, FINANCIAL, AND OTHER PROGRAMS. ADDITIONAL INFORMATION ABOUT SOFTWARE CAN BE FOUND IN REF B, PARA. 7.F. DETAILED INSTRUCTIONS FOR THE INVENTORYING OF SOFTWARE WILL BE POSTED TO THE CG PORTAL INVENTORY SITE ON 10 FEB 2012. MOST UNITS WILL NOT HAVE SOFTWARE ON THEIR FAM REPORTS. 8. UNITS IDENTIFIED AS REAL PROPERTY MANAGERS WILL ALSO BE REQUIRED TO COMPLETE AN ENVIRONMENTAL LIABILITY SITE ASSESSMENT (ELSA) OF THEIR REAL PROPERTY ASSETS. A LISTING OF THE UNITS REQUIRED TO COMPLETE THE ELSA, ELSA BACKGROUND INFORMATION, TRAINING, AND ELSA PROCEDURAL GUIDANCE WILL BE POSTED TO THE CG PORTAL INVENTORY SITE NLT 10 FEB 2012. 9. POCS: MS. WENDY.C.WATSON(AT)USCG.MIL AND LT JOHN.M.LEGATE(AT)USCG.MIL. FINCEN MS. DEBORAH.J.WHITE(AT)USCG.MIL. 10. MS. MARGO SHERIDAN, DIRECTOR OF FINANCIAL OPERATIONS/COMPTROLLER, SENDS. 11. INTERNET RELEASE AUTHORIZED.