| SFLC Std Spec 0000, General Requirements |
| SFLC Std Spec 0085, General Requirements for Drawing Preparation |
| SFLC Std Spec 0450, Electrical Power for Contractor's Tools & Equipment |
| SFLC Std Spec 0740, Welding and Allied Processes |
| SFLC Std Spec 0740 Appendix E, Stray Current Protection |
| SFLC Std Spec 2350, Inspect, Test and Recondition DC Propulsion Generators & Motors In-Place |
| SFLC Std Spec 2351, Overhaul DC Generators & Motors |
| SFLC Std Spec 3020, Overhaul AC Electrical Motors |
| SFLC Std Spec 3041, Shipboard Electrical Cable Test |
| SFLC Std Spec 3042, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation |
| SFLC Std Spec 3100, Inspect, Test and Recondition AC Sychronous Machines In-Place |
| SFLC Std Spec 3101, Overhaul AC Synchronous Machines |
| SFLC Std Spec 5000, Auxiliary Machine Systems |
| SFLC Std Spec 5100, Clean Shipboard Ventilation Systems |
| SFLC Std Spec 6310, Requirements for Preservation of Ship Structures |
| SFLC Std Spec 6341, Install Interior Deck Covering Systems |
| SFLC Std Spec 8634, Drydocking |
| SFLC Std Spec 8635, Temporary Services |
| SFLC Std Spec 8636, Temporary Hull Accesses |
| SFLC Std Spec 0000, General Requirements |
| SFLC Std Spec 0450, Electrical Power for Contractor’s Tools & Equipment |
| SFLC Std Spec 0740, Welding and Allied Processes |
| SFLC Std Spec 0085, General Requirements for Drawing Preparation |
| SFLC Std Spec 3020, Overhaul AC Electrical Motors |
| SFLC Std Spec 3041, Shipboard Electrical Cable Test |
| SFLC Std Spec 3042, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation |
| SFLC Std Spec 3100, Inspect, Test and Recondition AC Synchronous Machines In-Place |
| SFLC Std Spec 3101, Overhaul AC Synchronous Machines |
| SFLC Std Spec 5000, Auxiliary Machine Systems |
| SFLC Std Spec 5100 |
| SFLC Std Spec 6341, Install Interior Deck Covering Systems |
| SFLC Std Spec 8634, Drydocking |
| SFLC Std Spec 8635, Temporary Services |
| SFLC Std Spec 8636, Temporary Hull Accesses |
| SFLC NED 0000-01, Severe Weather Preparation for Drydock and Dockside Availabilities |
| SFLC NED 5735-01, Inspection and Test Procedure For Buoy Chain Winch Model CW-1 Onboard WLM 551 Through 564 And WLB 201-215 |
| SFLC NED 5831-01, Inspection and Test Procedure for Slewing Arm Davit Model D6000FCT On Board WLM 551 Through 564 |
| SFLC NED 5834-01, Inspection and Test Procedure for Small Boat Lifting Points and Slings On Board All Cutters |
| SFLC NED 5890-01, Inspection and Test Procedure for Diesel-Hydraulic Crane KB20-10-50 On Board CGB 67 & 69 |
| SFLC NED 5890-02, Inspection and Test Procedure for Buoy Crane Model
SB230-42 On Board WLM 551-564 |