R 251518Z NOV 09 ALCOAST 675/09 COMDTNOTE 16560 SUBJ: LONG RANGE NAVIGATION (LORAN-C) TERMINATION 1. EARLIER THIS YEAR, AFTER RELEASE OF THE PRESIDENTS FY10 BUDGET REQUEST THAT IDENTIFIED LORAN-C FOR TERMINATION, THE VICE COMMANDANT RELEASED AN ALL-HANDS EMAIL THAT DISCUSSED THE PLANNED TERMINATION AND OUR WAY FORWARD. SINCE THEN, A BROAD CROSS-FUNCTIONAL TEAM BASED OUT OF CGHQ, LED BY COMDT (CG-541) AND COMDT (CG-43), AND INCLUDING REPRESENTATIVES FROM PERSONNEL SERVICE CENTER, NAVIGATION CENTER, LORAN SUPPORT UNIT, THE CIVIL ENGINEERING PROGRAM, AND OTHER ELEMENTS, HAS DEVELOPED A COMPREHENSIVE TERMINATION PLAN THAT WILL FURTHER GUIDE OUR ACTIONS. ON OCTOBER 28, 2009,THE PRESIDENT SIGNED THE 2010 DEPARTMENT OF HOMELAND SECURITY APPROPRIATIONS ACT, WHICH DIRECTS THE COAST GUARD TO DISCONTINUE LORAN-C OPERATIONS NOT EARLIER THAN 4 JAN 2010 AS LONG AS CERTAIN CONDITIONS ARE MET. 2. THE ACT REQUIRES THE COMMANDANT TO CERTIFY THAT TERMINATION OF THE OPERATION OF THE LORAN-C SIGNAL WILL NOT ADVERSELY IMPACT THE SAFETY OF MARITIME NAVIGATION, AND FURTHER REQUIRES THE SECRETARY OF THE DEPARTMENT OF HOMELAND SECURITY TO CERTIFY THAT THE LORAN-C SYSTEM INFRASTRUCTURE IS NOT NEEDED AS A BACKUP TO THE GPS SYSTEM OR TO MEET ANY OTHER FEDERAL NAVIGATION REQUIREMENT. WHEN THOSE CERTIFICATIONS ARE MADE, THE U.S. COAST GUARD SHALL, COMMENCING JANUARY 4, 2010, TERMINATE THE TRANSMISSION OF THE LORAN-C SIGNAL AND COMMENCE A PHASED DECOMMISSIONING OF THE LORAN-C SYSTEM INFRASTRUCTURE. 3. OUR CURRENT MISSION REMAINS CLEAR. WE WILL CONTINUE TO STAND THE WATCH AND OPERATE THE LORAN-C SYSTEM UNTIL BOTH CERTIFICATIONS HAVE BEEN MADE. CONCURRENTLY, WE MUST PREPARE OURSELVES TO OPERATE IN ACCORDANCE WITH THE APPROVED BUDGET AND CONTINUE TERMINATION PROGRESS. IT IS CRITICAL THAT THROUGHOUT THE PLANNING PROCESS WE REMAIN STEWARDS TO THE TAXPAYERS, THE ENVIRONMENT, THE LOCAL COMMUNITIES THAT HOST LORAN SITES, AND MOST IMPORTANTLY THE GUARDIANS WHO HAVE LOYALLY OPERATED AND MAINTAINED OUR STATIONS FOR THE PAST FIFTY YEARS, AND WHO CONTINUE TO PROFESSIONALLY DO SO TODAY. 4. TAILORED INSTRUCTIONS FOR SIGNAL TERMINATION, AND STATION-SPECIFIC SHUTDOWN PROCEDURES, WILL BE TRANSMITTED OVER THE NEXT TWO MONTHS TO EACH STATION BY NAVCEN, THE OPERATIONAL COMMANDER OF THE NATIONS LORAN SYSTEM. 5. WE UNDERSTAND AND ACKNOWLEDGE THE CHALLENGES ASSOCIATED WITH EXECUTING A MISSION WHEN PROGRAMMATIC AND PERSONAL FUTURES ARE UNCLEAR. WE WILL CONTINUE TO DISSEMINATE INFORMATION TO AREAS AND DISTRICTS THAT HAVE LORAN STATIONS IN THEIR AORS, FOR FURTHER TRANSMISSION TO STATION PERSONNEL. THROUGHOUT THIS PROCESS, WE COLLECTIVELY REMAIN COMMITTED TO MINIMIZING PERSONNEL DISRUPTIONS TO THE EXTENT POSSIBLE WHILE FULFILLING OUR NATIONAL MANDATE TO FULLY OPERATE AND MAINTAIN THE SYSTEM UNTIL TERMINATED. 6. COAST GUARD PERSONNEL HAVE STAFFED AND OPERATED LORAN SINCE 1943. SINCE THAT TIME, LORAN HAS GONE THROUGH SEVERAL CHANGES WITH INCREDIBLE ACCURACY AND WITH NEAR ZERO LOST TIME. THE LORAN SYSTEM SUPERBLY SUPPORTED NAVIGATION AND POSITIONING NEEDS FOR MANY YEARS, AND HAS BEEN A FOUNDATIONAL ELEMENT OF THE COAST GUARDS LONG AND PROUD HISTORY. THANK YOU ALL FOR YOUR CONTINUED PROFESSIONALISM AND DEDICATION TO THE LORAN PROGRAM AND THE COAST GUARD. 7. POC: CDR BOB FEIGENBLATT, LORAN PROGRAM MANAGER, AT 202-372-1558, OR EMAIL BOB.I.FEIGENBLATT(AT)USCG.MIL. 8. RDML KEVIN COOK, DIRECTOR OF PREVENTION POLICY, SENDS. 9. INTERNET RELEASE AUTHORIZED.